Expert hydrology report 10 January 2011 flood—circumstances and contributing factors
Table of Contents
- Summary of Conclusions
- Introduction
- Qualifications and Experience
- Conflicts of Interest
- Structure of the report
- Key information
- The 10th January 2011 flood event
- Preparation of the GFCOI flood model
- Chronology of the 2011 flood event
- Effect of the Grantham quarry on flooding
- Effect of the railway embankment on flooding
- Testing model performance
- Corroboration by eye-witness accounts
- Flood evacuation
- Appendix A—References
- Appendix B—Technical reviews
- Appendix C—Extract of selected figures (enlarged)
- Appendix D—Cirriculum Vitae
- Appendix E—Letters of Instruction
Supplementary reports
- Expert hydrology report - supplementary material (PDF, 9MB)
- Expert hydrology report – supplementary report 2 (PDF, 6.8MB)
Videos
- Most likely scenario (MP4, 35.5MB)
- No quarry scenario (MP4, 35.6MB)
- No rail embankment (MP4, 35.7MB)
- Worst case scenario—greatest delay (MP4, 35.5MB)
- Worst case scenario—greatest drop (MP4, 35.5MB)
- Supplementary 1 - Most Likely (greatest delay) case, levee failure at 3:59pm (MP4, 36MB)
- Supplementary 1 - Most Likely (worst case delay) case, levee failure at 4:16pm (MP4, 36MB)
- Supplementary 1 - Most Likely case, with all bunds and spoil removed (pit remains) (MP4, 35.9MB)
- Supplementary 1 - Most Likely case for an approximated May 1996 flood (MP4, 123.9MB)
- Supplementary 1 - Pre-quarry case for an approximated May 1996 flood (MP4, 123.9MB)
- Supplementary 2 – Most likely scenario (MP4, 35.5MB)
- Supplementary 2 – No quarry operations scenario (MP4, 35.6MB)
- Supplementary 2 – No rail extended scenario (MP4, 35.6MB)